← All projects

Project · Controls & simulation

Grid Dispatch

Simulated data. All values are simulated for illustration only. They are not real grid, market, or price data.

Grid Dispatch plays back two simulated days on a power grid, with residential, commercial, industrial and EV-charging demand rising and falling through each day. Generators are dispatched in merit order, cheapest first: wind, solar and nuclear, then hydro, combined-cycle gas, coal and finally gas peakers, with a battery that charges on midday surplus and discharges after sunset. The last unit needed to cover demand sets the system price, which is why the price climbs in the evening as solar fades and more expensive plants come on.

I built it the way I approach control systems after more than 20 years in design and PLC/DCS work: model the process, then make the live state easy to read at a glance.

Press play or pause, change the speed, or drag the time slider to jump to any point in the 48 hours.

Grid Dispatch

48-Hour Economic Merit-Order Pool

DAY 100:00
Supply0MW
Demand0MW
0.0¢/kWh
SYSTEM λ · $0/MWh
    D1 00:00
    Cheapest plants dispatch first · price = last unit needed